Solar power rental solutions for projects across Nigeria

Application Guide

Power for Mining and Natural Gas Sites

Mining operations, natural gas projects and remote industrial sites may need temporary electricity for monitoring equipment, communications, site facilities and other compatible loads. Power planning starts with understanding the operating environment and actual demand.

Mining and natural gas site power planning

Industrial and Remote Sites

Plan Power Around the Operating Environment

Remote industrial projects can involve changing work locations, limited grid access, demanding operating schedules and challenging environmental conditions. Temporary power requirements should be assessed for each location and stage of work.

Depending on the load and site conditions, solar-powered and battery-based equipment may be worth evaluating for compatible monitoring, communications, lighting and other auxiliary applications.

Heavy machinery and critical industrial processes may require substantially different power arrangements. Equipment must be selected according to its verified specifications and the project's safety requirements.

Remote industrial site and power requirements

Potential Applications

Where Temporary Power May Be Considered

Suitability depends on the load, environment and equipment specifications.

01

Monitoring Equipment

Assess power for compatible sensors, remote monitoring devices and data collection equipment.

02

Communications

Include radios, routers, networking devices and other equipment required for site communications.

03

Temporary Site Facilities

Review the power needs of offices, inspection points and other temporary facilities, including their operating hours.

04

Selected Lighting Loads

Check the energy demand, operating schedule and environmental suitability of temporary lighting equipment.

Site Assessment

Understand the Technical and Environmental Limits

Before selecting equipment, document the connected loads, voltage, starting currents, daily energy demand and required runtime. Consider heat, dust, rain, vibration, transport access and the availability of maintenance.

Solar output depends on sunlight and installation conditions. Battery runtime depends on usable storage, connected demand and system losses. Any backup arrangement should be assessed against the project's operational needs.

A qualified site or electrical professional should determine whether the proposed equipment is appropriate for the location and intended use.

Remote site equipment planning

Important Safety Note

Confirm Site Suitability Before Deployment

Hazardous Areas and Industrial Standards

Some mining, gas-processing and extraction locations may contain flammable gases, vapours or combustible dust. Equipment used in these areas may need specific hazardous-area approvals and installation methods.

Do not deploy ordinary rental equipment in a potentially hazardous area unless the responsible site authority has confirmed its suitability. SunRent's equipment approvals and capabilities must be verified for the exact model and application.

Information to Prepare

  • Project location and site access conditions.
  • Equipment list and electrical specifications.
  • Required runtime and operating schedule.
  • Environmental conditions and installation location.
  • Any site safety standards or approval requirements.
  • Rental duration and delivery requirements.

Industrial Power Enquiries

Discuss Your Mining or Natural Gas Project

Share the site location, intended application, equipment requirements and rental period. SunRent can discuss the enquiry, with model suitability, availability, price and any site restrictions requiring confirmation.