1. Build a complete equipment list
Ask each event team to list its electrical equipment, power ratings and expected operating times.
Include production areas, vendors, temporary offices, lighting and any other loads that need power.
2. Identify critical loads
Determine which systems are essential and whether they require separate circuits or special operating arrangements.
Electrical distribution and protection should be designed and installed by appropriately qualified personnel.
3. Consider timing and site access
Record setup, event and breakdown dates, including when power must be available for testing and preparation.
Explain the venue access rules, equipment placement limits, transport restrictions and any requirements imposed by the organiser.
4. Review noise and environmental conditions
Consider noise restrictions, weather exposure, public access and the safe placement of power equipment.
Confirm the actual characteristics of the proposed equipment instead of assuming all solar or generator systems have identical operating conditions.
5. Confirm the arrangements
Discuss the rental period, delivery, installation, electrical distribution, supervision, support and collection.
Make sure responsibilities and costs are understood before the event date.